Mike Kushy and Jake Baynes. Mike went down with both drills first then realised he'd left the batteries for one drill in the car, so left one at the base of the shaft. Went to the dig face and started drilling. Jake arrived not long after with materials and the other drill in hand. Whilst Mike continued drilling Jake took the surplus drill back to surface and retrieved the wire that MK had hidden in a bucket. By the time Jake got back I had just finished drilling. With charge laid Jake headed out with the used drill. 1 hole at 1m on the left and one hole just under 1m on the left. One 1m hole on the right. MK then continued the set up and reeled out to the base of the shaft. Charge set off from there. Could feel the pressure quite substantially. Took the wire up a little higher and tied onto ladder. Arrived on surface to some very wet weather and JB had headed home. 1 1/2 hours. MK.
To watch the diggers in action on YouTube click here
Sunday, 6 October 2024
Friday, 4 October 2024
Friday 4th October 2024
John Cooper and Mike Kousiounis. MK went down to free up wire which JC coiled on surface. Then MK loaded rocks which JC hauled to the surface. 21 loads later drill sent down to MK who went off to dig face. JC moved the rocks onto the walls before departing. 1½ hours. John.
As above, then MK took the drill down to the dig face. The bang had done a really good job (sorry forgot to get photos). Cleared as much as possible then managed to pry some large slabs off the walls. These were broken down with pfs. Sam Hill arrived around 6ish. SH cleared bags of clatch and rocks back up cave. After a while MK left SH to have a go at removing more rock. MK went round to Boulder Rift to look at the place he and JC saw each other through (see report of 28th September 2024). MK also squeezed down into the lowest point of the Boulder Rift chamber (a wide but narrow gap in bedding). SH shone his light straight ahead at the dig face and MK could see it roughly 10ft away. Back in the Boulder Rift chamber MK did some draught testing. No draught from Tooth Dig, but a strong draught coming up into the BR chamber from the lowest point, strong outwards draught coming out of the dig face too...signifies there's something between the current dig face and Tooth Dig going on. The current view at the dig face looks like the ceiling rises some 10ft ahead. Next step is 45° 1m long drill holes to work our way ahead. About 4 1/2 hours for me. MK.
![]() |
Current end. Photo SH. |
Wednesday, 2 October 2024
Wednesday 2nd October 2024
John Cooper, Sam Hill and Mike Wise. JC arrived first and started
moving rocks from the shelf to the bottom of the entrance shaft. When SH
arrived he started moving rocks along Boulder Chamber. When JC had moved all
the rocks from the shelf to the bottom of the entrance shaft he collected SH
and together they hauled 12 loads to the surface. MW’s arrival interrupted them.
SH and MW went down to the dig face and SH assisted MW with reaming out the
holes and setting the charge. Meanwhile JC continued moving rocks from the
Boulder Chamber to the base of the entrance shaft. Once completed he went down and
assisted with carrying out the drill etc. All went OK. At present the wire is
down the entrance shaft and there is an unstable pile of boulders at the base awaiting
removal to the surface. 3¼ hours for JC. John.
Arrived at 1810 and staggered through the gates carrying 3 bags and 2 boxes to meet John at the surface hauling rocks with Sam below. Underground at 18.20 hours. Sam helped carry the kit to the face and also held the kit I didn't need from time to time because there are no usable flat surfaces to put things in reach. Looking down cave, first hole on left needed 50mm of crap drilled out, but the others were OK. Blowpipe used to blow out as much gritty water as possible. Brought 3m of 40g and also 3m of 5g. Front 4 holes charged to their bottoms, back 2 holes charged with what we had left over. Needed at least 2.5m of 5g. On the way out the rock pile below the ladder collapsed under me, with 4 rocks moving. One big one fell down missing the wire. I held the other 3. One was stashed back in a more stable spot but the other two went up and over into the old entry passage. Fired from surface. Back at the cars at 20.05 hours. Mike.
Tuesday, 1 October 2024
Tuesday 1st October 2024
John Cooper. Deepening and reaming out the 6 holes for Mike Wise
to use tomorrow. Problems with water and mud flowing down into the holes so not
sure how much useable depth they will have. Used the 600mm bit so a possible
500mm. 1½ hours. John.
Saturday, 28 September 2024
Saturday 28th September 2024
Mike Kushy and John Cooper.
MK went in ahead freeing up the bang wire, which JC reeled in, and took the drill to the bottom. Then cleared loose rocks up the slope back to the base of the awkward climb. When JC arrived the pair cleared the rocks at the base of the climb back to Boulder Chamber. JC then set to moving rocks up cave whilst MK went to the sharp end to clear the bang spoil, mostly gravel. I believe a lot had been washed forwards with the rain. A good couple of slabs peeled off from the right hand wall and these broke up with a hammer. Once suitably cleared MK then headed up cave to join JC. JC then headed to surface to mix some cement while MK continued clearing rocks back to the bedding slope higher up. The big shelf is pretty much full. MK met JC on surface and the mix was poured into 3 buckets. MK took 1 to the dig face to use whilst JC made his way in with the other 2. A wall was built on the left of the dig face and clatch put behind. MK used the 2nd bucket cementing steps into the floor and patching up some of the walls. JC used the 3rd bucket in Boulder Chamber. JC went round into the old cave to check if we could get a light connection to the hole on the left where we think a chamber is. It turns out JC could get into the chamber from the Boulder Rift area. This could be opened up better from the Boulder Rift side and would allow a lot of spoilt to go that way rather than up the steep slope. JC then left and MK drilled 6 holes, 12mm x 400mm, 3 on the floor on the left and 3 on the floor on the right. 4 1/2 hours for me. Mike.
![]() |
Before clearing. Photo MK. |
![]() |
After clearing. Photo MK. |