Wednesday, 2 October 2024

Wednesday 2nd October 2024

John Cooper, Sam Hill and Mike Wise. JC arrived first and started moving rocks from the shelf to the bottom of the entrance shaft. When SH arrived he started moving rocks along Boulder Chamber. When JC had moved all the rocks from the shelf to the bottom of the entrance shaft he collected SH and together they hauled 12 loads to the surface. MW’s arrival interrupted them. SH and MW went down to the dig face and SH assisted MW with reaming out the holes and setting the charge. Meanwhile JC continued moving rocks from the Boulder Chamber to the base of the entrance shaft. Once completed he went down and assisted with carrying out the drill etc. All went OK. At present the wire is down the entrance shaft and there is an unstable pile of boulders at the base awaiting removal to the surface. 3¼ hours for JC. John.

Arrived at 1810 and staggered through the gates carrying 3 bags and 2 boxes to meet John at the surface hauling rocks with Sam below.  Underground at 18.20 hours. Sam helped carry the kit to the face and also held the kit I didn't need from time to time because there are no usable flat surfaces to put things in reach. Looking down cave, first hole on left needed 50mm of crap drilled out, but the others were OK. Blowpipe used to blow out as much gritty water as possible.  Brought 3m of 40g and also 3m of 5g. Front 4 holes charged to their bottoms, back 2 holes charged with what we had left over. Needed at least 2.5m of 5g. On the way out the rock pile below the ladder collapsed under me, with 4 rocks moving. One big one fell down missing the wire. I held the other 3. One was stashed back in a more stable spot but the other two went up and over into the old entry passage. Fired from surface.  Back at the cars at 20.05 hours. Mike.

No comments:

Post a Comment