Mike Kushy and Mike Wise. Met for 1700 and got underground for 1730 after lowering 7 bags of materials, 4 swivel clips and a drill bag. All of this got took through to TPC. MK started preparing mixes whilst MW cleaned areas in the pit and bult up the left hand wall (as you look at the solid wall), 3 mixes in total. MK in the meantime was using pfs to break down larger rock for more decent building blocks. Another horizontal added to strengthen the frame also. 2 sand, 3 dust and 2 cement left in cave I believe (enough for another few mixes). Out for 2130. Mike K.