Mike Kushy and Jake Baynes. Mike went down with both drills first then realised he'd left the batteries for one drill in the car, so left one at the base of the shaft. Went to the dig face and started drilling. Jake arrived not long after with materials and the other drill in hand. Whilst Mike continued drilling Jake took the surplus drill back to surface and retrieved the wire that MK had hidden in a bucket. By the time Jake got back I had just finished drilling. With charge laid Jake headed out with the used drill. 1 hole at 1m on the left and one hole just under 1m on the left. One 1m hole on the right. MK then continued the set up and reeled out to the base of the shaft. Charge set off from there. Could feel the pressure quite substantially. Took the wire up a little higher and tied onto ladder. Arrived on surface to some very wet weather and JB had headed home. 1 1/2 hours. MK.