Friday, 4 October 2024

Friday 4th October 2024

John Cooper and Mike Kousiounis. MK went down to free up wire which JC coiled on surface. Then MK loaded rocks which JC hauled to the surface. 21 loads later drill sent down to MK who went off to dig face. JC moved the rocks onto the walls before departing. 1½ hours. John.

As above, then MK took the drill down to the dig face. The bang had done a really good job (sorry forgot to get photos). Cleared as much as possible then managed to pry some large slabs off the walls. These were broken down with pfs. Sam Hill arrived around 6ish. SH cleared bags of clatch and rocks back up cave. After a while MK left SH to have a go at removing more rock. MK went round to Boulder Rift to look at the place he and JC saw each other through (see report of 28th September 2024). MK also squeezed down into the lowest point of the Boulder Rift chamber (a wide but narrow gap in bedding). SH shone his light straight ahead at the dig face and MK could see it roughly 10ft away. Back in the Boulder Rift chamber MK did some draught testing. No draught from Tooth Dig, but a strong draught coming up into the BR chamber from the lowest point, strong outwards draught coming out of the dig face too...signifies there's something between the current dig face and Tooth Dig going on. The current view at the dig face looks like the ceiling rises some 10ft ahead. Next step is 45° 1m long drill holes to work our way ahead. About 4 1/2 hours for me. MK.

Current end. Photo SH.

No comments:

Post a Comment