Mike Kushy, John Cooper, Sam Hill and Dave Morrison.
MK started around 2.45, moved rocks at top of pit up cave. Filled up buckets from the bottom and filled up the retaining wall at the top of the pit. JC arrived not long after and ferried the rocks to the entrance shaft. SH arrived and helped JC clear the rocks to surface. JC then set about a mix whilst MK and SH emptied small buckets into the higher up rift. SH then went to the dig face and released some more rock. Meanwhile MK helped bring 3 big buckets of cement into the cave and stashed them for later use. The big rocks were then downsized and stashed ready for wall building/stabilising. Really cool draught at the bottom tonight, with a good view along a sloping cobble floor. A bolt has been put in at the head of the final climb down, ready for a pulley. Arrived on surface to find DM wall building. 4 1/2 hours for me. MK.
MK's YouTube video from today
|
Bottom of final climb down, looking inwards and downwards. Photo MK.
|
|
A bit further in. Photo MK.
|
|
Further in again. Photo MK.
|
|
Looking ahead into the left hand hole. Photo MK.
|
No comments:
Post a Comment