Mike Kushy and Frank Tully.
MK got to the cave at 10.30. Time was spent moving excess rock up cave. With this cleared, 10 small buckets were filled and stashed at the top of the pit. Time was then spent breaking up a large boulder. With this done MK moved all the loose rock to the base of the shaft and climbed up for a rest, catching Tuska's tour setting off. Returning to the dig all the small buckets were emptied into the higher rift, 3 x 10 small buckets cleared in total. Some more rock broken up and left at the top of the pit for building. MK then headed out to start mixing cement. FT had just arrived on surface (2ish). With FT at the bottom of shaft and MK on surface all the rocks were cleared to surface. MK set about making a mix whilst FT went down cave to see the dig and clear a bit more. 3 loads of big buckets of mix then went down and was used stabilising the dig face. A good view ahead, beyond both sides of an obstructing boulder. Nice draughting hole in the floor ahead too. 5 1/2 hours for me. MK.
MKs YouTube video from today
|
View into right hand hole, looking down. Photo MK.
|
|
View into right hand hole, looking straight ahead. Photo MK.
|
|
View of dig face, obstructing boulder with left and right holes. Photo MK
|
|
View of left hole, looking ahead. Photo MK.
|
No comments:
Post a Comment