Sunday, 19 January 2025

Sunday 19th January 2025

Mike Kushy and Tim Rose. Got to the dig around 10.30, took in 2 drills and charge materials. TR went to the dig face to pull stuff back and break down rock, whilst MK went to the hauling spot and pushed spoil back to create more room. After this the whole of the top dam was fully cleared, including any rocks that would fit in the small buckets. The hauling spot is now full to the brim and really needs 2 people up there to create more space. TR then went to the front and with MK above him in the dodgy boulder bit, a dozen or so buckets of mud were sent high up there. I think TR got a bit fed up of sliding into the 1m deep puddle, which seemed a good time to swap places and start drilling for the charge. MK drilled 5 holes @600mm, 3 into the already shattered slab to the right and 2 in a slab further ahead (hopefully that clears the puddle). Awkward set up, just had to give in in the end and lie knee deep in the water whilst setting up. TR packed drills and bag up and we both left, filled and fired fine. Cold as usual. This site is getting a bit desperate, I feel if we don't find some space in the next couple of charges we're going to struggle. 5 hours. Mike.

The dig face after clearing. Photo MK.

Thursday, 16 January 2025

Thursday 16th January

Mike Kushy, solo. Pool at the bottom pretty much dry on arrival. Cleared left over mud and rocks, then moved a very large rock in the floor. This was downsized and stacked to one side. Spent the rest of the session looking for a drainage hole. The 2ft crowbar goes right into silt and mud on the floor without hitting anything solid. Draught seems to be coming from out of the floor. 2 hours. MK.

Before clearing. Photo MK.

After clearing. Photo MK.

Sunday, 5 January 2025

Sunday 5th January 2025

Mike Kushy and Sam Hill. Got in for 11, took in 2 drills. Bloody wet couple of days, drippy throughout and nice stream coming in at the top Boulder Rift Chamber connection. SH went to the front and sent rocks back, some too large for buckets (will need breaking down). Lots of buckets tipped into the dam, which is now over full and needs clearing next. After rocks had been cleared the water had been found. After clearing as much mud and grit out as possible, it's now over knee deep. The pool is a 1mx1m. Unable to find a plug to drain the pool but there was easily enough water coming in today, that it should have flooded. MK had a go at the front for a bit, until stacking got desperate. We decided it was too wet to get drills out. 2 hours. Mike.

MK's YouTube Video from today

Before clearing. Photo SH.

After clearing. Photo MK.

SH in photo at the wet end. Photo MK.

Tuesday, 31 December 2024

Tuesday 31st December 2024

Sam Hill, Alex Randall and Mike Kushy. Took 2 drills and HE kit in. SH attacked the boulder in the floor at the face, whilst MK hauled and AR fed him buckets. After an hour or so MK got tired. SH then did some hauling with MK bucket filling, meanwhile AR had a go at the front. This lasted another hour or so and all the stacked top dam was cleared. AR had to pop out for half hour or so, MK and SH rebuilt the dam and filled it right up again. When AR got back MK went hauling, with AR bucket filling and SH at the front. MK came down and he and AR rebuilt and refilled the dam once more. All the pf work done, MK went to drill for charge. Meanwhile SH did more hauling, with AR filling buckets. 5 holes drilled @600, assisted SH and AR on set up. Filled and fired fine. Fresh at the bottom all session. The current stacking area is getting a bit overwhelmed. There's loads more that can go up there, but someone will have to go to the other side of the Tooth Dig loop and rake the stacked spoil right back. It's no longer possible to drop down from The Boulder Rift Chamber to the current dig site...unless of course you come from the Tooth Dig way 😬!  No photos, we were too busy enjoying ourselves getting covered in gloop and listening to Sam's German Propaganda music. Hard to describe the bottom, a rumble of rock was heard after the initial shock wave. 5 hours, Mike.

N/S survey overlay.

Happy New Year, from all us Conglomerates.

Monday, 30 December 2024

Monday 30th December 2024

Mike Kushy, solo. Took in drill and set to reducing the 'too big' rocks. 1 & 1/2 batteries used before the crawl. The dam is now about twice as high as yesterday and is filled up with mud and rocks from the bottom - be careful not to tip it! Would be nice to build a permanent dam once all is cleared and set up a dam/hose wash system. Went to the face and jiggled the 2nd dam a little to allow more mud to come out and allow the boulder in the floor more movement. The next 1 & 1/2 batteries were used on said boulder. Being very fractured it splits up really nicely, but there's a lot of it. The dig has become 'self digging' and there's a little black hole about 2 inches wide that the stream flows off into. Big clearance next, only 2 needed. 3 hours, Mike.

The top dam and spoil.
The retaining wall is just over a foot high. Photo MK.

Drainage hole. Photo MK.

Boulder in the floor at the dig face. Photo MK.