Sunday, 19 January 2025

Sunday 19th January 2025

Mike Kushy and Tim Rose. Got to the dig around 10.30, took in 2 drills and charge materials. TR went to the dig face to pull stuff back and break down rock, whilst MK went to the hauling spot and pushed spoil back to create more room. After this the whole of the top dam was fully cleared, including any rocks that would fit in the small buckets. The hauling spot is now full to the brim and really needs 2 people up there to create more space. TR then went to the front and with MK above him in the dodgy boulder bit, a dozen or so buckets of mud were sent high up there. I think TR got a bit fed up of sliding into the 1m deep puddle, which seemed a good time to swap places and start drilling for the charge. MK drilled 5 holes @600mm, 3 into the already shattered slab to the right and 2 in a slab further ahead (hopefully that clears the puddle). Awkward set up, just had to give in in the end and lie knee deep in the water whilst setting up. TR packed drills and bag up and we both left, filled and fired fine. Cold as usual. This site is getting a bit desperate, I feel if we don't find some space in the next couple of charges we're going to struggle. 5 hours. Mike.

The dig face after clearing. Photo MK.

No comments:

Post a Comment