Thursday, 16 January 2025

Thursday 16th January

Mike Kushy, solo. Pool at the bottom pretty much dry on arrival. Cleared left over mud and rocks, then moved a very large rock in the floor. This was downsized and stacked to one side. Spent the rest of the session looking for a drainage hole. The 2ft crowbar goes right into silt and mud on the floor without hitting anything solid. Draught seems to be coming from out of the floor. 2 hours. MK.

Before clearing. Photo MK.

After clearing. Photo MK.

No comments:

Post a Comment