Friday, 8 November 2024

Friday 8th November 2024.

Mike Kushy, Sam Hill and Tom Jackson. MK to start with  filling bags and moving rocks. SH and TJ arrived just as they were full. They moved the spoil back to the chamber. Several more bags were filled and moved. 4 holes were drilled, 1@1m, 3@600mm. Set and fired all fine. MK managed to squeeze down the rift at the front and managed to connect to the Tooth Dig loop. 3 hours for me. MK.

Wednesday, 6 November 2024

Wednesday 6th November 2024

Mike Kushy and Mike Wise. MK to start with, filling up bags and moving rocks. A lot of spoil has gone ahead and is unreachable. MW arrived just as the bags were full. These were moved up to the connection  then with MW in the stacking chamber everything was cleared. 4 holes drilled and set. All went off well. 3 hours for me. MK.

Tuesday, 5 November 2024

Tuesday 5th November 2024

Mike Kushy, Sam Hill and Alex Randall.

MK to start with, filled up bags and moved rocks up cave. Hammer and chiseled for a while. AR and SH arrived and moved the spoil to the stacking chamber. 4 holes drilled  2@750 and 2@600. Good holes. All went off well. 3 hours for me. MK 

Spoil. Photo MK.

Sunday, 3 November 2024

Sunday 3rd November 2024

Mike Kushy, Sam Hill and Joseph Mccomb. MK started around 11am. Took in drills and charge materials and left John's drill at the base of the entrance shaft. Set to work taking the point off the pointy boulder that's causing a nuisance with the hauling. Sketchy work but removed the proud bit and a lot of the face. After this I set to filling up bags and removing rock from the end. All the bags filled just as SH and JM arrived with John's drill. They started transporting the bags and rocks into the Boulder Rift Chamber. Meanwhile MK started drilling holes ready for the charge. 5 holes drilled but only 4 usable, 1 1m hole packed, 2 600mm and one about 350mm. Very very cold at the end, struggled handling the cable ties. Hard to describe the end currently and I forgot to take a photo. SH lowered the cable and JM then brought it to me. All went off fine. 3 1/2 hours for me.MK 

The pointy rock, no more. Photo MK.

Friday, 1 November 2024

Friday 1st November 2024

John Cooper. Three holes drilled in left hand floor. Met Mike Kushy coming in at Boulder Chamber as I was going out. 1½ hours. John.

Mike Kushy. Met JC on his way out after drilling. 3 good holes packed, just over 2m of 40gm. All went off well. MK.