Mike Kushy and Mike Wise. MK to start with, filling up bags and moving rocks. A lot of spoil has gone ahead and is unreachable. MW arrived just as the bags were full. These were moved up to the connection then with MW in the stacking chamber everything was cleared. 4 holes drilled and set. All went off well. 3 hours for me. MK.
No comments:
Post a Comment