Friday, 8 November 2024

Friday 8th November 2024.

Mike Kushy, Sam Hill and Tom Jackson. MK to start with  filling bags and moving rocks. SH and TJ arrived just as they were full. They moved the spoil back to the chamber. Several more bags were filled and moved. 4 holes were drilled, 1@1m, 3@600mm. Set and fired all fine. MK managed to squeeze down the rift at the front and managed to connect to the Tooth Dig loop. 3 hours for me. MK.

No comments:

Post a Comment