Wednesday, 1 July 2026

Wednesday 1st July 2026

Mike Kushy and Mike Wise. Met at 17.00 and got underground for 17.30 after lowering 7 bags of materials, 4 swivel clips and a drill bag. All of this was taken through to TPC. MK started preparing mixes whilst MW cleaned areas in the pit and built up the left hand wall (as you look at the solid wall), 3 mixes in total. MK in the meantime was using pfs to break down larger rock for more decent building blocks. Another horizontal added to strengthen the frame. 2 sand, 3 dust and 2 cement left in cave I believe (enough for another few mixes). Out for 21.30. Mike K.