AM - Mike Kushy, David, Louise and Jackson Morrison.
MK and DM continued with building the well whilst LM and JM filled the trailer with unusable rocks. After a while LM and JM went off for a walk. Pretty much done and ready for earth to be backfilled around the well and landscape the ground. Mike.
Entrance photos by DM.
PM - Sam Hill and Mike Kushy
Met Kushy and Tuska at the dig at 3pm and had a quick chinwag whilst admiring their handywork on the entrance. Kushy and myself then set off underground armed with the drill box and a drum of sand and a BDH of ready mixed cement between us. Once at the dig I made my way down and through the new stuff with Kushy staying up in the safe (ish) area. Once in TP chamber Kushy and myself got the light connection through the better looking approach to the chamber and I had a look around, marvelling at the new stuff. Kushy cleared the topside of this whilst I came back up and then he grabbed the drill box. With the large crowbar I went down to the lower side of this and pulled down what I could. One very large oven sized boulder came down and then took two more similar sized ones with it as is crashed down the chamber with a extremely loud racket which Kushy wasn't expecting. Having got what I could from the bottom I tried from the top but everything was too loose and unpredictable so a retreat was made up through the very snug squeeze into the horizontal stuff. I then joined Kushy as he was bringing down the second batch of cement to stabilise the way through the boulders. A very impressive find with a lot of stabilising work to be done. 2hrs for both of us. Sam.
![]() | ||
Looking horizontally Eastwards. Photo SH. The dig through to Tea Party Chamber is down to the right. |