Saturday, 26 July 2025

Saturday 26th July 2025

Mike Kushy, Ed Ford and John Cooper. MK to begin (10am) with drill, pried more rock at the dig face and downsized it. Prepped a ladder and belay line when EF arrived around 10.30. MK had another go at pushing the slope but the last little bit was just too tight. EF cleared some backlog whilst MK opened up the squeeze some more. MK finally got through with helmet off and could see it's well worth opening up more to get others in today. EF then had a go at the front for a while whilst MK filled buckets to be taken up. EF and MK then swapped places and it was looking so much easier. After MK finished there was enough room to pass through the squeeze 2 cavers abreast. Went on to explore leaving JC on the outside of the squeezes. Numerous squeezes along the bedding to the west and a few hairy boulder chokes before we eventually arrived at a chamber roughly 30m x 15m with a height of at least a few metres. Estimated 60m of horizontal passage today. Lots of cryogenic stal' in the chamber to tape off and formations. Obvious way on following the slope floor down but this will be another day and we have loads of stabilsing to do, it's only a matter of time before traffic in there gets someone really hurt. The chamber shall be called Tea Party Chamber (I suspect quite a few mugs will get drunk here). 6 hours, Mike.

MK's Youtube video for today.

Tea Party Chamber, EF in photo. Photo MK.

MK in the initial breakthrough point after widening. Photo EF.