Ed Ford & Mike Kushy headed down 10.30. Ed was sent down to the dig first with the drill box. The North wall has a boulder, currently supported but slowly getting undercut with only mud fill. The first point of the day was to support this with scaffolding. Once measured a 900mm section was cut by Kushy while Ed drilled a hole for a pin. With the scaff piece fitted we got on to the main job of pulling boulders out the floor. These still had a fair amount of fill around them. The first boulder came free after around 5 buckets with a bit of help from the crowbar. It was a bit disconcerting at first as the whole floor was lifting exposing another couple of moderate size boulders. Once loose these were plug and feathered. Upon the second round Ed got one stuck and had to drill more holes to split the bolder. Kushy took over and sped the whole process up with a steady stream of rock coming out of the floor and being stacked in the alcove. Ed started taking the fill and emptying it down some holes where he discovered the rocks sounded like they were falling deeper than the current dig. At this point Kushy had made a hole wide enough to slip through into the west wall. This bit of passage is all clean washed and appears to be rift like. There are two big boulders, frustratingly moving but not coming out. Ed swapped and had a go before giving up. Ed moved up to mix 2 Daren Drums of sand with half cement while Kushy went back to playing. The mix was used to shove some rock into the west wall and build a retaining wall. The dig is currently looking very promising with open passage beyond the two rocks. It seems to be following underneath a natural bedding plane. Good session spending around 5 1/2 hours. Ed.
MK's youtube videos from today
 |
Ed drilling pins for scaff', Ed facing east. Photo MK |
 |
The hole to the West. Photo MK. |
 |
Closer look into the West hole. Photo MK. |