Saturday, 12 July 2025

Saturday 12th July 2025

Lee Venning, Hollie London, Ed Ford and Mike Kushy. Met at 10. MK forgot his drill but fortunately LV had one he could bring. Took in drill and some drums of sand and 1 of cement. LV went to the dig face and cleared around 20 buckets, then HL went to the front and did around a dozen buckets. EF then went to the face and cleared until it was big boulders that needed downsizing. MK then went to the front and did some pf work. MK stayed at the face for the rest of the session, around 60 buckets cleared in total. HL then left and LV/EF started mixing up some cement, which MK used up at the face. Nice draughty hole in the floor, that draughts more the more stuff pulled out, but is hard to fully clear currently. LV and EF in the meantime removed more rock from the higher bucket route and flattened out the route well. MK used some cement to start a wall opposite the 'alcove' to hold back the ever slumpin' mud wall. LV and EF headed out with drill and whatever bags/drums they could manage. MK stayed on for another half hour and did his best to render up the upper bucket route. MK came out with 3 drums and a tackle sack, all tackle sacks and empty drums left in the lockbox on surface. 1 full drum of sand in the cave and 1/2 drum of cement. The dig face is mainly 1ft wide boulders that need prying and pf's down to size. 5 hours. Mike.

MK's youtube video from today

Looking down. Photo HL.

Looking down. Photo HL.

Looking down. Photo HL.

Draughty hole, this is looking east into the floor. Photo MK.

The beginning of the wall opposite the 'Alcove'. Photo MK.

Some rock removed for ease of the upper haul. Photo MK.

Final section of the upper haul, rock removed and rendered. Photo MK.