Wednesday 30 October 2024

Wednesday 30th October 2024

Chris George, Sam Hill, Stuart Jellis, Geoff Marchant, Milo Marchant, Adrian Miles and Simon Wedgewood. SH got to the dig for just after 6. Made a start clearing bang debris, filled 6 bags and shifted larger rocks back to the connection. Then joined by AM and more bags were filled and shifted. Kept clearing until 8 with 5 others turning up to help clear. Decent water worn tube in the right hand floor but more enlargement will be needed around area of previous bang. Two body  lengths down it looks like the floor levels out and cuts in right. Good cool draught. Finished by showing the others the rest of the cave. 2.5 hrs for me. Sam.

Before clearing. Photo SH.

After clearing. Photo SH.

No comments:

Post a Comment