John Cooper. Went to drill some holes in the bottom. However
there was still debris on it so after clearing in into the tunnel and the hole below
drilled the walls instead. 1 hour. John.
To watch the diggers in action on YouTube click here
Tuesday 10 October 2023
Tuesday 10th October 2023
Sunday 1 October 2023
Sunday 1st October 2023
Mike Kousiounis and Dave Morrison. Started by clearing the bottom of the shaft. Bucket still snagged in a couple of places so after clearing we opened up the shaft with some more plug and feathering. Happy with the bucket pull, we set about doing some cement work. John Cooper joined us around 2pm and we finished the last bit of cementing that needed doing to fully stabilise the shaft ready for banging. 5 hours. Mike.
Tuesday 19 September 2023
Tuesday 19th September 2023
John Cooper + 1. Three bags of sand taken across and added to the second dumpy bag. Another water carry was required today. John repairing the damage he’d done last week in the shaft Whilst cement was mixed on the surface and rocks were sent down. Very windy on the surface and a good draught coming out up the shaft. Another cementing session required once this one has gone off. Need to take another bag of cement across. The first dumpy bag of sand now empty. 2 hours.
Looking Down from Surface |
Looking Down from Changeover Ladder Point |
Friday 15 September 2023
Friday 15th September 2023
John Cooper. Chopping out more of the bits sticking out near
the top of the shaft. Definitely needs a lot of cement now. Pretty good haul
line now. 1½ hours. John.