John Cooper + 1. Three bags of sand taken across and added to the second dumpy bag. Another water carry was required today. John repairing the damage he’d done last week in the shaft Whilst cement was mixed on the surface and rocks were sent down. Very windy on the surface and a good draught coming out up the shaft. Another cementing session required once this one has gone off. Need to take another bag of cement across. The first dumpy bag of sand now empty. 2 hours.
Looking Down from Surface |
Looking Down from Changeover Ladder Point |
No comments:
Post a Comment