John Cooper, Rob Harper, Al Mills and Dave Morrison (Tuska). Surface levelling work all day. Attempt to erect cover showed up weakness in design. Back to the drawing board. 7 hours. john.
To watch the diggers in action on YouTube click here
Thursday, 7 July 2022
Thursday, 30 June 2022
Thursday 30th June 2022
John Cooper. Continued breaking up rock. Took in a couple of short bits of scaffold tube which will be used in building a roof over the ongoing tunnel. 1½ hours. John.
Friday, 24 June 2022
Friday 24th June 2022
John Cooper and Geoff Newton. Geoff loading and John hauling. Nice draught from the Wookey end. John then took over at bottom with a mix of cement and fixed a scaffold bar as a roof support. I think it may be necessary to completely wall up the bottom left hole. 2½ hours. John.
Thursday, 23 June 2022
Thursday 23rd June 2022
John Cooper, Al Mills and Dave Morrison (Tuska). Al and Tuska
arrived mid-morning and made a start on fabricating a shelter for the winch.
John arrived about 12.45 and after helping a bit descended and sent up spoil.
This revealed the winch had been moved quite a bit by the sheep so had to be
repositioned several times. When it started spitting with rain a halt to
hauling was called. John ascended and continued helping with the fabrication.
The rain held off. 2 hours for John. John.
Wednesday, 22 June 2022
Wednesday 22nd June 2022
John Cooper. Continued breaking up rock. Needs a good clearing session now then a tunnel roof constructing. Draught coming from Wookey end today. 2 hours. John.