John Cooper, Al Mills and Dave Morrison (Tuska). Al and Tuska
arrived mid-morning and made a start on fabricating a shelter for the winch.
John arrived about 12.45 and after helping a bit descended and sent up spoil.
This revealed the winch had been moved quite a bit by the sheep so had to be
repositioned several times. When it started spitting with rain a halt to
hauling was called. John ascended and continued helping with the fabrication.
The rain held off. 2 hours for John. John.
No comments:
Post a Comment