Wednesday, 26 January 2022

Wednesday 26th January 2022

John Cooper and David Morrison (Tuska). Tuska on the surface mixing with John below cementing boulders to prop up the entrance pipes. Not quite so muddy today. 2 hours. John.

 

Sunday, 23 January 2022

Sunday 23rd January 2022

Mike K, Tuska, Alan Mills and Mark Helmore. Cementing and stabilising the shaft again, a dozen loads put in. The shaft is now cemented all 360° all around the edge and tied in 2-3ft. deep all around. PF’d a boulder directly down and looking at a 6ft. drop down. Mike.

 

Tuesday, 18 January 2022

Tuesday 18th January 2022

John Cooper and Mike Kousiounis. Cool overcast but dry and no wind. Mike was working at the bottom cementing boulders to prop up the entrance pipe. John was on the surface mixing cement. Two bags of slab mix and two bags of sand. To each bag was added half a bag of ballast and some cement. The four mixes were split in half to lower down to Mike. Half a dozen small loads of mud were hauled out. Very muddy underfoot on surface. 2 hours. John.

 

Thursday, 2 December 2021

Thursday 2nd December 2021

About 2ft. below the shaft now, support work around the base of the shaft before more digging. Removed one boulder and an incredible breathing draught coming from below. I think T’ might be hiding a secret. Mike, Wayne and Tuska.

 

Friday, 12 November 2021

12th November 2021

From Kushy. We used the digger on the 12th November '21. So I would count that as the first session. I didn't write a report sorry. Wayne, Tusker and I there. We uncovered the sleepers, then spent a few weeks moving them into place and digging out the soil.