John Cooper and Mike Kousiounis. Cool overcast but dry and no
wind. Mike was working at the bottom cementing boulders to prop up the entrance
pipe. John was on the surface mixing cement. Two bags of slab mix and two bags
of sand. To each bag was added half a bag of ballast and some cement. The four
mixes were split in half to lower down to Mike. Half a dozen small loads of mud
were hauled out. Very muddy underfoot on surface. 2 hours. John.