To watch the diggers in action on YouTube click here
Saturday, 17 February 2024
Saturday 17th February 2024
Loose blocks on the floor and far side capped. Some larger boulders in the floor also capped. Cementing on the near side with the intention of building a pillar to support the rock in the roof. Also infilling gaps on the left hand side with rocks and cement. Adrian.
Friday, 16 February 2024
Friday 16th February 2024
Mike Kushy and John Cooper.
MK started at 11am, took in drill and used the batteries taking apart the big boulder, still some of it left over. Buckets of clatch were filled and emptied behind the retaining wall. At 13.30 JC arrived and came down the bottom to help move a few dozen more buckets of clatch. Cement mixes were then made. 6 decent buckets were used in total, John filling some gaps higher up and MK working on stabilising the bottom. A decent pillar was built up to an overhanging boulder and a step was created to ease getting in and out of the very bottom. Interesting holes appearing at the bottom, one deep hole in the floor and a few straight ahead. 3 big blocks to dismantle and we could be into a new area. Finished at 16.00. 5 hours for me, Mike.
![]() |
The dig face. Photo MK. |