John Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Carried
across a new bag of cement. John pointed out yesterday’s cementing so Adrian
and Pete could avoid it. Capping kit taken in and used by Adrian breaking up
boulders. One mix of cement done and taken down for use by Pete then John was
despatched to get his drill and more caps. Lots more breaking up boulders by
Adrian as well as clatch deposited behind retaining walls. Another mix of
cement then done before calling it a day. No sand left, only stone dust in 1
dumpy bag. Third of a bag of cement left. Nigel got down the ladder and back up
it again but didn’t get off the bottom. A couple of boulders hauled out to show
willing, however plenty of space to build them into support walls. 4½ hours.John.
Loose
blocks on the floor and far side capped. Some larger boulders in the
floor also capped. Cementing on the near side with the intention of
building a pillar to support the rock in the roof. Also infilling gaps
on the left hand side with rocks and cement. Adrian.