Ed Ford, Oli Hill and Sam Hill met for 1800 and kitted up. Freya Bearn and Stuart Jellis were a little behind us. Six sections of ladder and two drill bags went down to Tea Party Chamber. SH started attacking the boulders in the bottom with EF behind to haul up rocks. The other three set about removing the annoying horizontal scaff bar and building up the ladder. SH and EF switched after a lot of boulders had been broken down and an attack on the lower bedding slab failed. You can see a 2m'ish section into a low bedding but beyond it drops into a nice caver sized canyon. EF then started working his way left to another promising hole. A lot more rock has been hauled out to the chamber and both ways on look very promising. The five of us headed out and made surface for about 2100. A bit more scaff and some brackets will be needed to finish of the lower part of the shaft. The ladder piece up in the squeeze will be needed as well but there will then be a solid way in and out of the dig. A lot more rock breaking and hauling next session. Sam.
|
| The ladder! Needs an extra length and bolting on at the top. Photo SH. |
|
| Looking left. Blocks below drill now removed. Below is a phreatic tube heading down. Photo SH. |
|
| Looking through the tight section of bedding. Photo SH. |


