Mike Kushy, Mike Wise and Sam Hill. All down cave for around 6.30pm. Took in drill and extra batteries plus charge materials. The wire was tested from the shaft as it hadn't been used for a while, no signal so took the tester to the joint. Tested higher wire from lower end and all fine, tested lower wire and no signal. Took the tester to the furthest end of the wire and discovered stripped cable and ends broken, fixed and tested okay. MW began drilling the up and over boulder, whilst SH cleared out behind where the recent rock moved ready for cementing. MK made some mixes in TPC and sent them up to SH. In the meantime MK kept moving rock around in TPC to make the floor better. Around 8.30pm MW called that he was all set up so we decided it was a good time to leave. Charge set off from Boulder Rift Chamber, very quiet considering we were only 30m of bang wire away. 2 1/2 hours. Mike K.