Wednesday, 2 July 2025

Wednesday 2nd July 2025

AM - Mike Kushy and Mike Wise arrived around 11. We took in drill and 5 lengths of conveyor. MW took edges and lumps from the bucket path whilst MK pushed down the spoil pit and made more room for stacking. The conveyor worked well but lacking anchor rock we need to take in some bigger pins. Got to surface around 1.30pm for lunch with Tuska and to help get his generator out of his car. 2 1/2 hours, MK.

PM - Mike Wise, Mike Kushy, John Cooper, Hollie London, Ed Ford and Tuska. JC arrived around 2pm and he MK and MW headed on down. To start JC sat by the alcove with MK on the step and MW filling buckets. We cleared 20 buckets into the alcove, pretty smooth and uneventful. HL arrived around 2.30 and replaced JC who went to the top haul. MW and MK swapped places and 70 more buckets cleared. HL then went to the dig face and MK swapped with MW. After several buckets HL called up to MK and asked for some assistance. MK climbed down and found HL was using a 15-20kg rock as a pillow. MK offered to take the pillow off HL's shoulder and HL was able to climb out, leaving MK to hold the boulder. We decided to climb out a little and let everything settle. HL went back to hauling and MK cleared the loose from higher up, during this more good sized rocks fell out and everything felt quite uncomfortable and we decided to let it settle for a while. We stopped at 100 buckets. Just as we had finished EF arrived, so MK and EF went to look at the Puddle Dig which is definitely clearable. May be a good plan to go back to clearing Puddle Dig on a Wednesday evening whilst we engineer Cement Dig. We need to scaff' frame and cement our way down Cement Dig steadily, best to do as full days on weekends. Good draught as usual, which seems to come from up cave slightly, nice holes in the floor getting larger and wall looking more wall like with what seems to be another ledge lower down. 4 hours. MK.

EF in Puddle Dig. Photo MK.

No comments:

Post a Comment