Saturday, 7 June 2025

Saturday 7th June 2025

Michael Kousiounis and John Gisborne. Met 10am and took in drill, water and 2 daren drums with premixed cement and sand in. JG went for a look at the sharp end, then MK went in and broke up the nuisance rock from Wednesday evening. JG in the meantime started making a mix and sent the first load down to MK to carry on the wall building. A second mix was made and this was used supporting the opposite wall. Buckets filled up ready. Lots of calcite amongst the spoil at the bottom and the floor seems to be drying out well. All daren drums brought out and left with sacks in container, ready to get filled up with sand and taken back in. 2 1/2 hours. Mike.