Mike Wise, Mike Kushy and Sam Hill to do some clearing of the rubble at Cement Dig meeting at 1800. Before we could get at the dig debris, we needed to do some tidying up in the approach passage. MK hauled buckets of smaller material, while MW and SH dealt with larger blocks which were lifted out and stashed out of the way in the calcited rift area. This took at least 30 minutes.

With only three of us, heroic efforts had to be made, especially by Sam, with MW passing him buckets and MK somewhere above disposing of debris. Nevertheless, a veritable mountain of loose material  flew up in our shiny, but overpoweringly pleasant smelling new buckets and out via 2 bucket drag lines. A good few large rocks also somehow were got all the way out. This was kept going for an hour or so taking us to around 2045. Unfortunately, we all forgot to count the buckets.

MW then did some drilling. The floor in front of the left hand alcove shown in the final photo from Saturdays blog entry was dug back to what seemed to be a solid base. 6 holes were drilled. The back wall is split by a diagional joint; above the joint are some calcite features, below is clean rock. At some point during this activity MW found himself talking to MK rather than SH as SH had departed; it was getting late. MW and MK exited at 2200 after subjecting the drilled alcove to a bit of a prod.

Photo by Mike Wise 

Sam playing piggy in the middle

Ok, I admit the Easter Bunny may of helped !

No comments:

Post a Comment