Monday 3rd February 2025

Mike Kushy, solo. Took in drill and made rocks smaller, these got tossed into the dam. Lost some mud in a crack to one side and tipped several buckets into the dam. Went to the sharp end and the air was very frosty. Worked on some temporary walls some more, which were backfilled with mud from the bottom of the puddle. Some decent rocks retrieved from the pool and sent further back, all the buckets are filled and further back too. Once again some stirring with the crowbar ahead. There's a very large block in the floor under the puddle which moves. 2 hours. Mike.
Didn't take any photos, so here's a Lidar image with the cave entrance marked in green.