Mike Kushy and Adrian Miles.
AM went ahead with drill and started on holes whilst MK moved the bang wire further down cave. 5 hopes drilled and MK assisted AM on the set up. 2m of 40 used and fired, all went off well. The shock wave felt a lot greater this charge than any previous, even though we didn't use much material. 1 1/2 hours. Mike.
AM drilling at the dig face. Photo MK. |
No comments:
Post a Comment