Mike Kushy and Callum Simmonds. MK arrived just before 10.30 armed with drill (although it never got used). Went down and assessed the stability of the dig face after the last charge. All looked good and there was a lot of rock to move. The bedding chunk was completely shattered and unable to see the puddles. Built a little wall higher up and emptied some spoil behind it. CS then arrived around 11. With him hauling all the buckets and temporarily stacked spoil was cleared. CS then went to the very dig face and passed many buckets and rocks back. This is now littered all over the place and buckets poured behind the ever increasing temporary wall (do we make it permanent?). CS had to leave around 1.30. MK stayed on for another hour and worked on clearing the floor and opening some drainage. A big block in the floor moves and can be broken up later. A good clearance session needed with 4 people, 2 sessions for 2. It looks good and feels very fresh, Bang On! 4 hours for me, Mike.
Debris at dig face. Photo MK. |
Debris at dig face. Photo MK. Both photos looking straight on, horizontally |
No comments:
Post a Comment