Sunday 13 October 2024

Sunday 13th October 2024

Mike Kushy, solo. Took a drill in and set about clearing the bang spoil. The effect of the bang was perfect. With everything cleared as much as possible from the dig face side I then put the drill, hammer and pfs into the connection and went back up cave to the higher boulder rift connection. From the other side I grabbed the tools and cleared rock from there. A little pf work to get rid of a couple of larger rocks. I then squeezed through the newly opened connection with drill. The new connection could be made bigger, but I don't think it needs it. It would also be good to get some cement work to each side. After this I filled up several sacks of clatch and put them near the new  connection. There's a heck of a lot of spoil to clear at the dig face. This could be done with 2 people but would be most suited to a team of 3-4. The ledge needs clearing of loose rock near the new connection also. 1 1/2 hours. MK 

MK's YouTube video from today

Bang debris in the new connection. Photo MK.

New connection all cleared. Photo MK.

Current dig face. Photo MK.

No comments:

Post a Comment