Sunday, 15 September 2024

Sunday 15th September 2024

Mike Kushy and Nicky Pearce. 

Made a 2 bucket mix and me and NP took a bucket in each. NP used the 1st bucket up on the right hand wall, whilst MK had a go at the boulders ahead. Managed to take enough off to allow access to the floor. The 2nd bucket was used by MK to build a retaining wall on the left and cement in the boulders in the ceiling, NP had left during this. MK then cleared as much out of the floor as physically possible and put it behind the new wall. The floor needs drilling and banging to allow progress ahead. 4 hours. MK 

A view under the boulders ahead, I'm about 2 body lengths in. Photo MK.

The dig face. Photo MK.