Wednesday, 29 May 2024
Wednesday 29th May 2024
John Cooper and Andy Thompson. Started by hauling out the rocks left
at the bottom of the entrance shaft. Then moved down a stage and moved the
rocks left at the bedding up to the bottom of the entrance shaft. Then moved on
down again and moved all the rocks off the shelf across to the slope. Then
moved down to the very bottom and cleared the rocks from there into the chamber
where I suggest they are used as walling (cementing required). Then moved back
up cave and moved the rocks from the slope up to the bedding. With all stacking
spaces now full we repeated the clearance of the base of the entrance shaft but
this time ferried the rocks from the bedding to the bottom of the entrance
shaft as space became available. Only one rock would not fit and required the
use of an open topped hauling bucket. 2½ hours.John.