Dave Morrison, John Cooper and Trevor Hughes. Tuska hauling from the surface, John transferring tubs of spoil and rocks with myself at the bottom. Good progress- removing a lot of wet mud and gravel, revealing moveable rocks and open vertical voids. A stacked pile of biggish, just about moveable, rocks need to be broken up and cleared away. Much more work needs to be done before any passage gain possible. A good start though. 2 hours. Trevor.
Cave being rebuilt on surface, we can have the caverns as large as you would wish. David.