Saturday 24th February 2024
John Cooper, Pete Hann, David Morrison (Tuska) and Jude
Vanderplank. Carried across two new bags of sand. One full mix of cement done
and used by Pete (60%) at the bottom building supporting walls whilst John used
up the rest higher up. Meanwhile Tuska was building walls on the surface. A
second full mix was then done before Tuska left. Pete used all of it at the
bottom. His
wall now reaches and supports the roof boulder. One large boulder cemented into
the floor as it was too big to fit on a wall. As we were finishing Jude appeared to inspect the work. 3 hours. John.