Saturday 24 February 2024

Saturday 24th February 2024

John Cooper, Pete Hann, David Morrison (Tuska) and Jude Vanderplank. Carried across two new bags of sand. One full mix of cement done and used by Pete (60%) at the bottom building supporting walls whilst John used up the rest higher up. Meanwhile Tuska was building walls on the surface. A second full mix was then done before Tuska left. Pete used all of it at the bottom. His wall now reaches and supports the roof boulder. One large boulder cemented into the floor as it was too big to fit on a wall. As we were finishing Jude appeared to inspect the work. 3 hours. John.

Bottom, inwards and downwards. Photo JV.

No comments:

Post a Comment