Sunday 21 May 2023

Sunday 21st May 2023

Michael Kousiounis and Andy Thompson. Tooth dig. Took both drills in. Cleared all of the alcove out to the bottom of the climb/chamber, some was left in the corner area. AT then went to work on rock at the end of the tunnel whilst MK worked on the squeeze over the slab, a good chunk was removed from the slab and should be easier to break up next time. Rocks were cleared back from the sharp end into the alcove and this is now nearly full up again. Should be enough space for one more session though. The end is draughting. 5 hours. Mike.


Andy at the end of the bedding tunnel, Tooth Dig

No comments:

Post a Comment