Tuesday 27 December 2022

Tuesday 27th December 2022

John Cooper and Mike Kousiounis. Took in enough sand for 3 mixes and cement for 6 mixes plus the drill. Left the drill at the start of the Boulder Rift but the rest went to the bottom dig. John did 3 mixes of cement which Mike used up walling. John then came out with all the empty bags leaving Mike to go to the Boulder Rift dig. 2 hours. John.

After finishing with John cementing (12.30pm ish), Mike K went to do some more work at the most recent dig in the Boulder Rift. Plug and feathering away. Andy Thompson arrived just after 2pm  to provide some much appreciated help. Andy then took over p and f work whilst Mike went to inspect the collapse from Thursday down the other BR dig site. The collapse was obvious and has opened up a lot more room to get to the bottom, there is also a view of some decent space below heading towards the new site. Mike and Andy left the site just before 4, two decent sized boulders to break up still but out of battery power. There's enough cement and water at the cementing site but some more sand will need taking in. 5 hours in all. Mike.


*Photo looking vertically down on the recent dig site, most of the boulder on the left has now been removed*

No comments:

Post a Comment