Tuesday 20 December 2022

Sunday 18th December 2022

John Cooper, Mike Kousiounis and Andrew Thompson. Took in sand, cement, mixing tub, dexion and drill (not used). Whilst Mike sorted out his skeleton dexion frame in the bottom pit Andy sent up buckets of spoil for John to stack. Once Mike was ready a mix of cement was done which Mike used to hold the frame in place. Lots more cementing will be required before any progress can be made. 2½ hours. John.

From logbook : A trip down to the dig to do a cementing and scaffolding session. We each lugged a tackle sack to the dig face and Mike assembled the angle iron whilst John and I hauled some of the catch out from the right hand wall on the approach to the face. A short cementing session at the end. Lots more cement needed. 1/3 of cement left in drum. 2 1/2 hours. Andy T.