John Cooper and Andrew Thompson. Andy at the bottom and John on the
surface. Andy started by breaking up the big rock left by Mike and then another
one from the side. John hauled the bits to the surface. Then some clatch hauled
out. Finally a few rocks broken up for Mike to use as walling material. Depth
now 10.8m. 6 bags of sand, 2 bags of cement and 2 containers of water on site.
2 hours. John.
No comments:
Post a Comment