Wednesday 26 January 2022

Wednesday 26th January 2022

John Cooper and David Morrison (Tuska). Tuska on the surface mixing with John below cementing boulders to prop up the entrance pipes. Not quite so muddy today. 2 hours. John.

 

Sunday 23 January 2022

Sunday 23rd January 2022

Mike K, Tuska, Alan Mills and Mark Helmore. Cementing and stabilising the shaft again, a dozen loads put in. The shaft is now cemented all 360° all around the edge and tied in 2-3ft. deep all around. PF’d a boulder directly down and looking at a 6ft. drop down. Mike.

 

Tuesday 18 January 2022

Tuesday 18th January 2022

John Cooper and Mike Kousiounis. Cool overcast but dry and no wind. Mike was working at the bottom cementing boulders to prop up the entrance pipe. John was on the surface mixing cement. Two bags of slab mix and two bags of sand. To each bag was added half a bag of ballast and some cement. The four mixes were split in half to lower down to Mike. Half a dozen small loads of mud were hauled out. Very muddy underfoot on surface. 2 hours. John.