Tuesday 10 October 2023

Tuesday 10th October 2023

John Cooper. Went to drill some holes in the bottom. However there was still debris on it so after clearing in into the tunnel and the hole below drilled the walls instead. 1 hour. John.

Sunday 1 October 2023

Sunday 1st October 2023

Mike Kousiounis and Dave Morrison. Started by clearing the bottom of the shaft. Bucket still snagged in a couple of places so after clearing we opened up the shaft with some more plug and feathering. Happy with the bucket pull, we set about doing some cement work. John Cooper joined us around 2pm and we finished the last bit of cementing that needed doing to fully stabilise the shaft ready for banging. 5 hours. Mike.

Tuesday 19 September 2023

Tuesday 19th September 2023

John Cooper + 1. Three bags of sand taken across and added to the second dumpy bag. Another water carry was required today.   John repairing the damage he’d done last week in the shaft Whilst cement was mixed on the surface and rocks were sent down. Very windy on the surface and a good draught coming out up the shaft. Another cementing session required once this one has gone off. Need to take another bag of cement across. The first dumpy bag of sand now empty. 2 hours.

Looking Down from Surface

Looking Down from Changeover Ladder Point

Friday 15 September 2023

Friday 15th September 2023

John Cooper. Chopping out more of the bits sticking out near the top of the shaft. Definitely needs a lot of cement now. Pretty good haul line now. 1½ hours. John.