Tuesday, 18 January 2022

Tuesday 18th January 2022

John Cooper and Mike Kousiounis. Cool overcast but dry and no wind. Mike was working at the bottom cementing boulders to prop up the entrance pipe. John was on the surface mixing cement. Two bags of slab mix and two bags of sand. To each bag was added half a bag of ballast and some cement. The four mixes were split in half to lower down to Mike. Half a dozen small loads of mud were hauled out. Very muddy underfoot on surface. 2 hours. John.

 

Thursday, 2 December 2021

Thursday 2nd December 2021

About 2ft. below the shaft now, support work around the base of the shaft before more digging. Removed one boulder and an incredible breathing draught coming from below. I think T’ might be hiding a secret. Mike, Wayne and Tuska.