Saturday, 30 November 2024

Saturday 30th November 2024

Sam Hill, Mike Kushy, Callum Simmonds, Ben Ashley and Mysti Ommer met for half ten, underground by 10:45. SH cleared bang debris and then broke up a few larger chunks with PF. CS then took over digging and cleared out a lot of mud and some large boulders. Ben and Mysti were ferrying up to the connection where Kushy was stacking. Ben and Mysti then dug a few buckets out and we called it a day after 4hrs. Good draft coming out the left hand hole this time. Lots more mud and rock to come out of the floor. Sam.

Before clearing. Photo SH.

After clearing. Photo SH.

After clearing. Photo SH.

Friday, 29 November 2024

Friday 29th November 2024

Mike Kushy, solo. Drilled 5 holes, 3 @600 and 2@400. All went off fine. 1 1/2 hours. MK.

Thursday, 28 November 2024

Wednesday 27th November 2024

Mike Kushy, John Cooper, Sam Hill, Mike Wise, Trevor Hughes, Ed Ford and Jake Baynes. MK, JC and SH in a bit earlier. Started by moving the stashed rocks up cave, others arrived randomly and eventually rocks were daisy chained straight to the Boulder Rift. Once MK at the front had moved rocks up to JC from the face he then squeezed through the latest connection (3rd) to Boulder Rift to help JB moving rocks further away. *note: the squeezes through the 3rd connection are not easy, unable to do on your front..and there's 2 like that*. Once bags started being filled with clatch everyone moved down one position. Then MK joined JC at the dig face so bags were getting filled twice as quick. It got to a point where reaching the floor for spoil became difficult again, a large rock sticking out the floor needs banging to progress. Draughty black hole appeared in the floor and takes all the stream water (about an inch). Est' 50 bags and 25 rocks moved this evening. Sterling work by everyone. 2 1/2 hours for me. MK.

Sunday, 24 November 2024

Sunday 24th November 2024

Mike Kushy and Geoff Newton. Geoff's first time into the new dig area, think he was impressed by how far it went. Very wet in the cave, an impressive stream flowing towards the dig once you pass the 1st connection point. Sounds of water below us somewhere and all the water seems to sink straight ahead rather than heading off left. Anyway, MK reduced the slab down to size whilst GN ferried some rocks to the connection point. After rock reduced MK then joined GN and they passed a few large rocks through into the stacking area. 2 hours. MK.

Thursday, 21 November 2024

Thursday 21st November 2024

Mike Kushy, solo. Took in drill to reduce boulders down with pfs. All went well, even managed to take some big bits off the bedding floor. At the end I tried to take a corner off to allow me to get in further, but a big slab peeled off which will need more battery power to reduce. Strongest draught coming from straight down rather than off to the left. 3 hours. MK 

MK's youtube video from today

Big slab that peeled off and a view of off to the left at the bottom. Photo MK.