Wednesday, 13 December 2023

Wednesday 13th December 2023

John Cooper,  Mike Kousiounis (Kushy). Cleared spoil, and did a lot of cementing (4 bags of sand!). No sand left on site, small amount of cement and small amount of water. All need topping up now. 4 hours.

Props. Photo MK>

Saturday, 9 December 2023

Saturday 9th December 2023

Christmas Elves broke into W.R. & hung a new 10ft ladder section, bolted to the bottom of the  Galv ladder.







Thursday, 7 December 2023

Thursday 7th December 2023

Broke up all the bigger rocks left in horizontal passage by me and Sam last night. All of these are now cleared to the surface. Worked on opening up the shaft ready for the next section of ladder. Next step is to put a scaff bar brace across to the boulder that looks like it's moving then cement up more. This will allow us to safely clear the build of of loose stuff. Mike.

Moving boulder that needs bracing. Photo MK.

One hole in the floor (1/2ft wide). Photo MK.

Another horizontal hole looking the opposite direction. Photo MK.

Wednesday, 6 December 2023

Wednesday 6th December 2023

Sam Hill started about 40 minutes before me, I arrived at 6.15pm. Sam had spent the time breaking up the bigger rocks that have been stacking up in the horizontal tunnel. Just as I arrived Sam had finished breaking up the last rock, so we cleared all the debris. After this Sam went to the bottom of the shaft and cleared out as much loose as possible, 2 big rocks stopped further progress. I joined Sam down the bottom and we plug and feather the big boulders to manageable sizes. There was enough room then for Sam to get in lower and fish out some bigger rocks, all of this has been stashed in the horizontal tunnel ready for downsizing and clearing. Lots of loose stuff to clear at the very bottom and a deep hole off to one side. Upon leaving went to make a video and had realise one boulder had dropped a considerable amount since leaving the bottom area. Alot more stabilising to do yet. Good inwards draught. 3 3/4 hours. Mike K

The boulders we're working through. Photo MK.

The boulder that started dropping, notice the gap between the boulder and cement. There was no gap at the beginning of tonight's session. Photo MK.

Wednesday, 29 November 2023

Wednesday 29th November 2023

pm. John Cooper and Mike Kushy. John on the surface hauling and mixing cement, Mike underground. Cleared the spoil Mike created with plug and feathering. Then 3 mixes of cement (8 loads) and loads of building rocks sent down to Mike for wall building. There’s probably enough sand for 1 good mix left. 2½ hours. John.

Before cementing. Photo MK.

Cement Work. Photo MK.

Cement Work. Photo MK.