Sunday, 6 March 2022

Sunday 6th March 2022

Mike, Tuska, Chris W. and John. Mike and Tuska breaking up boulders and winching out for a few hours, about 6ft lower again. Bedding type roof heading towards Wookey direction at about 45°, the opposite way there is a draughting hole in the floor. Cement work done at the end with Chris and John popped over to say “Hello”. Mike.

 

Friday, 4 March 2022

Friday 4th March 2022

John Cooper and Dave Morrison. Some clatch moved to surface so Kushy can Plug and Feather more boulders. 1 hour. John.

 

Saturday, 12 February 2022

Saturday 12th February 2022

John Cooper joined Mike Kousiounis (Kushy), Dave Morrison (Tuska) and Chris Williams for the afternoon session setting up on the surface. 2 hours. John.

Initial setup.

Wednesday, 2 February 2022

Wednesday 2nd February 2022

John Cooper and David Morrison (Tuska). Tuska organised delivery of the winch and ladder which he started fettling in the morning. I turned up about 1.30pm with some water as there was none for mixing cement. Spent a while deciding where and how to fix the entrance ladder. Left it propped on rocks pending a proper base being constructed Sunday. Finally spent some time cutting off welded on nuts from the winch frame. 2 hours for me. John.

 

Wednesday, 26 January 2022

Wednesday 26th January 2022

John Cooper and David Morrison (Tuska). Tuska on the surface mixing with John below cementing boulders to prop up the entrance pipes. Not quite so muddy today. 2 hours. John.